# SitePulse | Operations software for telecom contractors

> Operations software for telecom contractors. Connect scope, planning, crews, materials, field work, and closeout. Keep the whole job connected.

Canonical page: https://www.site-pulse.ai

OPERATIONS SOFTWARE FOR TELECOM CONTRACTORS

## From quote to closeout. Keep the whole job connected.

Connect scope, schedules, crews, materials, field work, and closeout. See what’s ready, what’s blocked, and what needs to happen next.

[Request a demo](https://www.site-pulse.ai/#demo) [Explore a project](#product)

Agreed scope Ready work Field evidence Client handoff

THE GAPS BETWEEN THE TOOLS

### The job is connected. Your information should be, too.

01 / SCOPE → PLAN

#### The scope changes. The crew plan doesn’t.

An updated requirement lives in a quote or email while the crew works from yesterday’s instructions.

[Keep scope with the work →](https://www.site-pulse.ai/product#scope-planning)

02 / PLAN → FIELD

#### The crew is scheduled. The materials aren’t ready.

The missing kit comes to light when people are already committed, and someone has to piece together the alternatives.

[See a readiness decision →](#scenario)

03 / FIELD → ACCEPTANCE

#### The work is done. The evidence is missing.

The office is chasing a photo or test result while the client is waiting for documentation they can accept.

[Connect evidence to handoff →](https://www.site-pulse.ai/product#closeout)

ONE PROJECT / EVERY HANDOFF

### Follow the work. Keep the context.

Cedar Ridge is a fictional three-sector antenna modernization. Follow Crew 04 from the agreed scope to the evidence needed for acceptance.

CEDAR RIDGE / SITE 024 / CREW 04

01 / Quote & scope

#### The promise becomes the plan.

Carry the agreed scope and client requirements into the work. Keep the original commitment in view when details change.

HUMAN DECISION / Construction manager

Confirm the awarded scope before committing a crew.

CEDAR RIDGE / Quote & scope Illustrative workflow · Sample data

**Antenna replacement** 3 sectors In scope

**Grounding upgrades** 6 kits required In scope

**Closeout evidence** Photos + test results Required

 A shared starting point for planning.

02 / Plan the work

#### Put the work in a workable order.

Connect activities, dependencies, crew assignments, and evidence requirements. A date on a schedule has a reason behind it.

HUMAN DECISION / Planner

Assign Crew 04 and sequence the work around site access.

CEDAR RIDGE / Plan the work Illustrative workflow · Sample data

**Antenna replacement** Crew 04 · Day 1 Planned

**Cable labeling** Crew 04 · Day 1 Planned

**Grounding upgrades** After kit arrival Dependent

 A crew commitment with its requirements attached.

03 / Check readiness

#### Find the gap before the crew does.

Check the people, qualifications, materials, equipment, access, and approvals needed for the selected work on its planned date.

HUMAN DECISION / Materials coordinator

Verify delivery of six grounding kits. A vendor promise is not a site receipt.

CEDAR RIDGE / Check readiness Illustrative workflow · Sample data

**Crew + access** Confirmed for Day 1 Ready

**Antenna equipment** Available on site Ready

**Grounding kits** 0 of 6 received Blocked

 Grounding is blocked. Other work can still be reviewed.

04 / Record the day

#### The field record stays with the work.

Capture progress, Daily Field Reports, Job Hazard Assessments, and photos against the site and work they describe. Give the office context for review.

HUMAN DECISION / Foreman · Crew 04

Record antenna replacement and cable labeling as complete; keep grounding open.

CEDAR RIDGE / Record the day Illustrative workflow · Sample data

**Antenna replacement** Progress recorded Complete

**Cable labeling** Photos attached Complete

**Daily Field Report** Office review next Sent

 Recorded progress, with evidence the office can inspect.

05 / Respond & replan

#### A blocker comes with a next step.

See what changed, who needs to respond, and which commitments are affected. Compare choices and keep the human decision with the revised plan.

HUMAN DECISION / Planner + materials coordinator

Move grounding to Day 2, subject to confirmed kit receipt and a fresh readiness check.

CEDAR RIDGE / Respond & replan Illustrative workflow · Sample data

**Grounding upgrades** Day 1 → Day 2 Replanned

**Kit receipt** Coordinator to confirm Open

**Crew 04 commitment** Readiness check required Conditional

 A revised commitment, not an assumption that the problem is solved.

06 / Review & close out

#### Done in the field. Ready for acceptance.

Connect the agreed requirements to photos, reports, tests, and review. See the gaps before preparing the client handoff, and keep acceptance distinct from completion.

HUMAN DECISION / Office / closeout

Hold the final handoff until grounding evidence is recorded and reviewed.

CEDAR RIDGE / Review & close out Illustrative workflow · Sample data

**Day 1 report** Reviewed for handoff Ready

**Grounding evidence** After Day 2 work Outstanding

**Client acceptance** External confirmation Pending

 A clear view of what still stands between work and acceptance.

**Read the complete walkthrough**

1. **Quote & scope.** Carry the agreed scope and client requirements into the work. Keep the original commitment in view when details change. **Decision:** Confirm the awarded scope before committing a crew.
2. **Plan the work.** Connect activities, dependencies, crew assignments, and evidence requirements. A date on a schedule has a reason behind it. **Decision:** Assign Crew 04 and sequence the work around site access.
3. **Check readiness.** Check the people, qualifications, materials, equipment, access, and approvals needed for the selected work on its planned date. **Decision:** Verify delivery of six grounding kits. A vendor promise is not a site receipt.
4. **Record the day.** Capture progress, Daily Field Reports, Job Hazard Assessments, and photos against the site and work they describe. Give the office context for review. **Decision:** Record antenna replacement and cable labeling as complete; keep grounding open.
5. **Respond & replan.** See what changed, who needs to respond, and which commitments are affected. Compare choices and keep the human decision with the revised plan. **Decision:** Move grounding to Day 2, subject to confirmed kit receipt and a fresh readiness check.
6. **Review & close out.** Connect the agreed requirements to photos, reports, tests, and review. See the gaps before preparing the client handoff, and keep acceptance distinct from completion. **Decision:** Hold the final handoff until grounding evidence is recorded and reviewed.

One project. Connected decisions at every stage.

[Explore the full product →](https://www.site-pulse.ai/product)

WHEN THE PLAN MEETS THE SITE

### A missing material. A visible next move.

See why the connections matter. Choose how the planner responds to a material delay.

CEDAR RIDGE / BEFORE DAY 1 Illustrative workflow · Sample data

#### Grounding kits haven’t arrived.

Six kits are required. None are recorded on site. Grounding cannot start, but the entire job isn’t blocked.

Affected work

Grounding upgrades · Crew 04 · Day 1

Responsible role

Materials coordinator: confirm receipt

Decision owner

Planner: review the crew commitment

● Grounding blocked

YOUR CALL / TWO POSSIBLE RESPONSES

Two possible human responses are shown below.

##### Keep Crew 04 on ready work.

Antenna replacement and cable labeling have the required people, access, equipment, and materials. The planner chooses those activities for Day 1.

REVISED DAY 1 **Antenna replacement + cable labeling** Grounding stays blocked. The materials coordinator still owns kit receipt.

This is the Day 1 decision shown in the sample report.

##### Move grounding to a conditional Day 2.

The planner changes the grounding commitment. The new date depends on confirmed kit receipt and another readiness check; changing a date does not clear the blocker.

REVISED GROUNDING COMMITMENT **Day 2 · pending kit receipt** The planner reviews Crew 04’s remaining Day 1 work before confirming the crew plan.

After execution, grounding photos and test results still need review.

SHARED CONTEXT / DIFFERENT RESPONSIBILITIES

### The right detail. For the person making the call.

01 / OPERATIONS

#### See the commitments. Spot the exceptions.

Understand which jobs need attention, what is blocked, and who owns the next response.

02 / PLANNERS & CONSTRUCTION MANAGERS

#### Make a plan the crew can perform.

Keep scope, dependencies, readiness, and crew commitments connected as conditions change.

03 / FOREMEN

#### Know the work. Record what happened.

Give the crew a shared context for the day. Capture progress, blockers, reports, and photos where they belong.

04 / OFFICE & CLOSEOUT

#### Review with context. Hand over with clarity.

Find the evidence, identify corrections, and prepare client documentation with outstanding requirements in view.

SOMETHING YOU CAN INSPECT

### The work, in a record you can hand over.

A Daily Field Report gives the office a clear account of what happened, what is still blocked, and what comes next.

This fictional Cedar Ridge report uses SitePulse’s document format. Open it, read it, download it. No form required.

[Download sample PDF](https://www.site-pulse.ai/downloads/sitepulse-sample-dfr.pdf) [See the report →](https://www.site-pulse.ai/sample-report)

[DAILY FIELD REPORT / DAY 1 SAMPLE Actual document format · Fictional project data ↗](https://www.site-pulse.ai/sample-report)

GETTING STARTED

### Start with one working workflow.

A useful rollout connects the people in the field with the people planning and reviewing their work.

1. 01
    
    #### Review your workflow.
    
    Bring your scope, client requirements, reports, and the handoffs that need attention.
    
2. 02
    
    #### Set up a first project.
    
    Agree supported configuration, responsibilities, and the initial crew and office reviewers.
    
3. 03
    
    #### Train, use, and refine.
    
    Work through the field and office flow together. Review what needs adjusting before expanding.
    

[What to bring. What to expect. →](https://www.site-pulse.ai/getting-started)

PRACTICAL QUESTIONS

### Know what to expect.

**Who is SitePulse for?**

Telecom contractors coordinating multiple crews, construction managers, and office reviewers. SitePulse connects the scope you commit to with the work, people, materials, and evidence needed to deliver it.

**Can crews use it on a phone?**

Yes. The Field experience is designed for phones, with an Office experience for planning and review on a larger screen. Review your actual devices and browser requirements with us during setup.

**What happens with a weak or missing connection?**

Plan on connectivity for setup, access to current work, and submission. Do not assume every task can start or be completed offline. We will review your field conditions and the supported connection-dependent steps in the demo.

**Will this fit our client’s requirements?**

Bring a sample of the reports, photos, test results, and handoff requirements your clients expect. We will review supported configuration and identify gaps. Downloaded documents can be delivered through your existing process; client portals and acceptance rules still apply.

**How do setup and support work?**

Start with a workflow review, supported configuration, and an initial project and crew. Plan training for both field and office users. Contact SitePulse through the inquiry form for setup or support questions; timing and service scope are agreed with your team.

**Can we get our documents out?**

Reports and selected document packages can be downloaded for your client handoff. For other data access, retention, or migration needs, tell us what you need so we can confirm the scope before you commit.

**What happens in the demo?**

We walk through scope, planning, readiness, field reporting, and client handoff using your workflow as the guide. Tell us where work gets disconnected today. We will discuss fit, setup, and commercial terms directly; submitting the form does not subscribe you to a mailing list.

LET’S CONNECT THE WORK

### Bring your workflow. We’ll bring the walkthrough.

Show us where the handoffs get difficult. See how SitePulse connects scope, readiness, field work, and closeout.

1. Your team and current process
2. A project from scope to client handoff
3. Fit, setup, and next steps

No mailing-list signup. No commitment to buy.
